翻訳と辞書
Words near each other
・ G7th Capo Company
・ G8 (disambiguation)
・ G8 Alternatives
・ G8 Climate Change Roundtable
・ G8 Research Group
・ G8+5
・ G80 Guangzhou–Kunming Expressway
・ G8011 Kaiyuan–Hekou Expressway
・ G85 Yinchuan–Kunming Expressway
・ G8511 Kunming–Mohan Expressway
・ G9
・ G9 (album)
・ G90
・ G91 Liaozhong Ring Expressway
・ G92 Hangzhou Bay Ring Expressway
G9211 Ningbo–Zhoushan Expressway
・ G93 Chengdu–Chongqing Ring Expressway
・ G94 Pearl River Delta Ring Expressway
・ G9411 Dongguan–Foshan Expressway
・ G95
・ G98
・ G98 Hainan Ring Expressway
・ G99
・ G99 Taiwan Ring Expressway
・ GA
・ Ga (Indic)
・ Ga (Javanese)
・ Ga (kana)
・ GA Bunko
・ Ga Central District


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

G9211 Ningbo–Zhoushan Expressway : ウィキペディア英語版
G9211 Ningbo–Zhoushan Expressway

The Ningbo−Zhoushan Expressway (), commonly referred to as the ''Yongzhou Expressway'' () is an expressway in Zhejiang, China which links Ningbo to Zhoushan. In the National Trunk Highway System (NTHS) in China, the number of this highway is G9211.
The expressway derives its name from the combination of two one-character Chinese abbreviations of both Ningbo and Zhoushan (Ningbo−Yong, Zhoushan−Zhou). Starting from the Qianyang hub on the G1501 Ningbo Ring Expressway and ending on the National Highway G329 at Yadanshan Dock, the road can be divided into two parts. The first section which was opened to traffic at the end of 2010, starts from the Qianyang hub and ends at the Jiaochuan hub, which is shared with the G1501 Ningbo Ring Expressway. The second section starts from the Jiaochuan hub and ends at the Yadanshan Dock. It contains 5 cross-sea bridges, and was opened to traffic on December 25, 2009.〔(Chinese) (高速公路名称和路牌要改了 本网特制高速出行宝典 )〕
== Construction History ==
The section from Jiaochuan to Yadanshan was called The Project Connecting Zhoushan Islands and Mainland, which have a length of 48 kolometers, the largest project that connects islands with mainland in China.〔(Chinese) (中国规模最大岛陆联络工程 舟山跨海大桥通车 )〕 The first phase of the project began construction in September 1999 and open to traffic on January 1, 2006. It comprises three bridges: Cengang Bridge, Xiangjiaomen Bridge and Taoyaomen Bridge. The second phase was endorsed by NDRC in China and began construction on May 20. On December 25, 2009, both phases was open to traffic.〔(Chinese) (架千岛彩虹 建连岛大桥 )〕 The section from Qianyang to Baoguosi have a length of 7 kilometers, began construction in 2005〔(Chinese) (“宁波绕城”80%资金撤了 北仑港高速成了负面典型 )〕 and finished in December 26, 2007.〔(Chinese) (宁波绕城高速公路西段正式建成通车 )〕 The section from Baoguosi to Jiaochuanhave a length of 13 kilometers, began construction on February 27, 2008〔(Chinese) (宁波绕城高速公路东段工程暨甬江特大桥开工典礼隆重举行 )〕 and finished in the end of 2010.〔(Chinese) (舟山跨海大桥与宁波绕城高速年底连接 )〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「G9211 Ningbo–Zhoushan Expressway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.